Work Accelerates on Building
Cold weather has not slowed the work of Robbins Construction on the SDNA building. Within a matter of a few weeks, the Robbins crew had the building framed up and enclosed. Now, they are working inside framing up walls and insulating walls. Electrical work will begin soon. The top photo is a view inside the main office room. This room will have a vaulted ceiling. The middle photo shows the backside of the building. The third photo is from the parking lot on the south side of the building.