Last Saturday, Nov. 3, the concrete for the ground floor was poured. This view is from the parking lot near approximately the southeast corner of the building.
Tuesday, November 6, 2007
Ground Floor Concrete Poured
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment