Wednesday, December 19, 2007
Floor Plan for SDNA Building

Sunday, November 25, 2007
Work Progresses on Building
There has been considerable work at the building site the past few weeks. And it's all work that the contractor wanted to complete before the weather turned really cold. The curb and gutter and sidewalks are completed. The first layer of asphalt has been put on the parking lot. A floor covers the basement portion of the building. Now construction can start on the building frame.
Sunday, November 11, 2007
Work on Curb, Sidewalk
Tuesday, November 6, 2007
Ground Floor Concrete Poured
Monday, November 5, 2007
Basement Floor Poured
Parking Lot Work
Monday, October 8, 2007
Foundation Work Continues
Monday, October 1, 2007
Digging the Basement
Thursday, September 20, 2007
Second Clip from Groundbreaking: A Group Photo
Here is SDNA's Susan Smith getting everyone together for a group photo at the groundbreaking.
SDNA President Bill Krikac Remarks
Brief video from Aug. 17 Groundbreaking: Introductory comments by SDNA President Bill Krikac of Clark County Courier.
Friday, August 31, 2007
Work has begun!
Mark it down: Friday, Aug. 31, 2007. Bowes Construction of Brookings began excavation work on the building site this morning, scraping black dirt from the lot and doing some leveling to the lot. This photo is taken from the southeast corner of the lot. Recent rains have softened the ground, making it easier for Bowes to do their thing. Cool!
Thursday, August 30, 2007
SDNA Land Ready to Go
The lot on which the SDNA Building will be built is staked and ready for dirt work in this Aug. 30 photo. Excavation work begins on the lot tomorrow with the black dirt scraped and elevation work done on the site. This photo is taken from the southwest corner of the lot. The stake in the foreground is the southwest corner of the lot.
SDNA Groundbreaking